Installing a basement egress in Perkasie, PA
This homeowner wanted to add an entrance to their basement. Steelway was happy to provide them with a safe exit! We excavated, cut into foundation, and installed a pre-cast concrete basement egress. All in just 1 day!
-
The digging with the excavator has been done!
The area along the house has been excavated, and we are now ready to make the cut into the foundation.
-
Cutting into the foundation
The water-cooled track saw is in place and ready to cut into the foundation.
-
84” Pre-Cast unit has been placed in the ground
The unit has been lowered into the ground. We are now ready to install the drainpipes around the unit, in the ground, at the request of this homeowner in Perkasie.
-
Drainpipes on the left side of the unit
The first part of the pipes have been installed.
-
Continuation of pipes
More drainpipes have been installed, per the request of the homeowner.
-
Finished pre-cast concrete basement egress install!
Filled the area around the unit to complete the installation of this 84" Pre-Cast concrete Basement Egress!