Steel unit replaced with concrete in Colmar, PA
This house in Colmar, PA had an old steel unit that was rusty and leaking, so the homeowner called Steelway. We had one of our sales representatives go out and take measurements to manufacture a new cellar door in the King of Prussia plant. On the day of installation, one of the crews went out, removed the old steel unit and replaced it with a precast concrete set of steps with a galvanized steel angle cellar top. Looks fantastic guys!
-
Ready for Concrete
The old steel unit was removed and now the precast concrete unit can be placed in position.
-
Steps in place
The precast concrete steps are in position.
-
Ready for the Steel top
The steps have been attached to the house, and now the cellar door can be installed on the top.
-
Galvanized Angle cellar door installed
The Galvanized top has been installed on the precast concrete steps.